PHIL Inverter Test Report: Analysis of High-Penetration Levels of PV into the Distribution Grid in California, March 12 - March 16, 2012
Author:
Kromer, M.
Year:
2013
Abstract:

This report describes power hardware-in-the-loop simulation testing of a 500 kW Satcon photovoltaic inverter, conducted at the Center for Advanced Power Systems at Florida State University from March 12th through March 16th, 2012. Testing was led by a team from the National Renewable Energy Laboratory. The report reviews the results of data captured during the course of testing. The tests were used to demonstrate operation of and gather data from the inverter in a simulated operational environment. Testing demonstrated the ability of the inverter to operate in either a Power Factor Control Mode or a Reactive Power Command Mode, and to respond to real power limits.

Document Type:
Report
Source:
NREL