Owner of the document requires that the content be not remodified or redistributed.
Share |



Seeo, Inc Smart Grid Storage Demonstration Project
Javascript is required to view this map.
Lead Organization:
Seeo, Inc
HQ Location:
Berkeley, California
Project Contact Information:
Name:
 Kimberly Nuhfer
Email:
 Kimberly.Nuhfer@netl.doe.gov
Address:

626 Bancroft Way, Suite 3B
Berkeley, CA 94710-2224

 
Project Summary:

Develop and deploy a 25kWh prototype battery system based on Seeo's proprietary nanostructured polymer electrolytes starting in 2010. This new class of advanced lithium-ion rechargeable battery will demonstrate the substantial improvements offered by solid state lithium-ion technologies for energy density, battery life, safety, and cost. These batteries would be targeted for utility-scale operations, particularly Community Energy Storage projects.

Targeted Benefits:

--Job creation
-- Electricity reliability improved
--Cost of electricity reduced
--Gasoline consumption decreased
--Greenhouse gas emissions reduced
--Global competitive edge gained by the U.S.

 
Additional Information:

For more information about the project, please refer to:
- http://www.smartgrid.gov/project/seeo_inc_solid_state_batteries_grid_sca...

Click the PDF icon to download the project description: