Owner of the document requires that the content be not remodified or redistributed.
Share |



Atlantic City Electric Company Smart Grid Project
Javascript is required to view this map.
Lead Organization:
Atlantic City Electric Company
HQ Location:
Mays Landing, New Jersey
Project Contact Information:
Name:
 Sunil Pancholi
Email:
 svpancholi@pepco.com
Address:

5100 Harding Highway
Mays Landing NJ 08330

 
Project Summary:

The Atlantic City Electric Company’s (ACE) SGIG Distribution Automation project is deploying distribution automation assets, direct load control devices, and a wireless communications network. Direct load control devices are being offered that provide financial incentives for customers for allowing ACE to cycle air-conditioners or control thermostats during peak periods. Distribution automation devices, which include feeder monitors, equipment condition monitors, and automated feeder switches improve the reliability and power quality of the distribution system. These systems also reduce operation and maintenance costs as well as distribution line losses.

Equipment:

- Programmable Communicating Thermostats
- Direct Load Control Devices
- Distribution Automation Equipment for 24 out of 339 Circuits
- Distribution Automation Communications Network
- Automated Distribution Circuit Switches
- Automated Capacitors
- Equipment Health Sensors
- Circuit Monitors/Indicators

Targeted Benefits:

- Improved Electric Service Reliability and Power Quality
- Reduced Operating and Maintenance Costs
- Reduced Costs from Equipment Failures and Distribution Line Losses
- Reduced Greenhouse Gas and Criteria Pollutant Emissions

 
Additional Information:

For more information about the project, please refer to:
- http://www.smartgrid.gov/project/atlantic_city_electric_company_sgig_dis...

Click the PDF icon to download the project description:
Build Metrics:
Archive: