Owner of the document requires that the content be not remodified or redistributed.
Share |



Success Story: Pickwick Electric Uses Distribution Fault Anticipator to Detect and Locate Fault to Improve Service Reliability
Author:
Ashok Sundaram
Year:
2006
Abstract:

“It can be a massive effort to track down a problem in a large service area when you don’t know where to start looking. The Distribution Fault Anticipator (DFA)’s monitoring capability alerted us to the fault and narrowed down the search area tremendously. With information from DFA, the job of tracking down a problem goes from something gargantuan to something manageable in a hurry. Most of the time now I’m aware of an impending problem prior to getting any customer calls.”

—John Bowers, Operations Manager, Pickwick Electric Cooperative.

Document Type:
Fact sheet
Source:
EPRI