Owner of the document requires that the content be not remodified or redistributed.
Share |



Residential Energy Gateway – Phase II Report
Author:
Daniel Arnold, Michael Sankur, Kevin Ding
Year:
2010
Abstract:

This report describes the work done during Phase II of the Residential Energy Gateway (REG) project, spanning the timeframe from Jan. 1, 2010 – Sept. 30, 2010. Work was supported via funding from the California Energy Commission (CEC), administered through the California Institute for Energy and the Environment (CIEE). Research and design of the REG was conducted in the Mechanical Engineering Dept. at UC Berkeley.

Document Type:
Report
Source:
UC Berkeley