Abstract: | This report describes the work done during Phase II of the Residential Energy Gateway (REG) project, spanning the timeframe from Jan. 1, 2010 – Sept. 30, 2010. Work was supported via funding from the California Energy Commission (CEC), administered through the California Institute for Energy and the Environment (CIEE). Research and design of the REG was conducted in the Mechanical Engineering Dept. at UC Berkeley.
|