Abstract: | The presentation was made at IEEE PES 2011 General Meeting Super Sessions in July, 2011. The presentation describes Electric Vehicle Supply Equipment (EVSE) standards status, charging configurations and ratings, document status - revision plan, DC Fast charge standardization, DC Fast charge coupler summary, combo coupler design status, and other items - China state grid battery swap. Proposed SAE charging configurations and ratings terminology and J1772™ revision plan (w/ DC) were presented. DC charging Configuration A, Configuration B, and Configuration C were presented.
|