Implementation of Centralized Remedial Action Scheme - An Important Step towards WAMPAC
Author:
Jun Wen
Year:
2011
Abstract:

The presentation was made at IEEE PES 2011 General Meeting Super Sessions in July 2011. The presentation describes the challenges and needs of Wide Area Monitoring, Protection, and Control (WAMPAC). Key design features include: 1) Centralized information enabling wide area protection and control; 2) Improved speed performance to maximize transfer capability; 3) Standardized substation layout approach; 4) System monitoring and active diagnostics; 5) Centralized configuration management; 6) Centralized data management; 7) Sequential automated end-to-end testing; 8) Compliance reporting tools.

Document Type:
Slide presentation
Source:
IEEE PES GM 2011