Abstract: | Create the Planning Model using the Network Model Management System (NMMS) software and the selected Network Operating Model Change Requests (NOMCRs), Planning Model Change Requests (PMCRs) and the Outages as required. Special Action Model Requests (SAMRs) will also be selected and included in the model package. The output is a RAWD file. The CRR Contingency File and the CRR Settlement File should also be packaged and sent with this model if required. The output is a RAWD file that can be used by the PSS/E software to study the model.
|