Related Resources on Use Cases

 

Deployment Experience: Use Cases

Use Cases are the descriptions of smart grid applications that define the important actors, systems and technologies, and their requirements that are part of the smart grid applications. The Smart Grid Information Clearinghouse (SGIC) provides links and synopses to available smart grid-related Use Cases from trusted sources, such as EPRI Intelligrid and Southern California Edison (SCE). Use the tool below to browse available Use Cases by smart grid domain and year. The search results are sorted alphabetically by information source and title. The link from each Use Case title provides a brief description and the ability to download the full document.

Please note that all Use Cases available in the Clearinghouse are subject to Terms and Conditions set forth by the original repository owners, i.e. EPRI and SCE.


Filter
Smart Grid Domain
Year From
To
 


Search Results

274   results
Title Source Yearsort icon Post date
Network Equivalents between EMS and Planning
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Network Extension
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Network Modification
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Process Contingency Definition Submittal V0.3
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Process Dynamic Rating V0.3
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Process Network Operations Model Change Request (NOMCR) V0.14
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Process Planning Model Change Request (PMCR) V0.3
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Process Special Action Modeling Request (SAMR) V0.4
EPRI Use Case Repository
2010
01/27/2010 - 17:16
State Estimation
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Transport Contingency Specifications
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Adaptive Transmission Line Protection
EPRI Use Case Repository
2010
01/27/2010 - 17:16
AGC Frequency Control
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Application Adjusts Load To Meet System Capacity Based On Settings From System Operator
EPRI Use Case Repository
2010
01/27/2010 - 17:16
As-Built Equipment Installation-Commissioning
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Define Transmission Outage Schedules
EPRI Use Case Repository
2010
01/27/2010 - 17:16
End To End Testing Of Protective Scheme
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Extension Implementation
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Extension Planning
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Hours Ahead Load Optimization
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Inter-Area Oscillation Damping
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Load Shedding - By Frequency Relay
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Load Shedding - By Order
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Low Side Rollover Specifications
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Maintenance Engineer Monitors Health of Primary Equipment
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Network Colouring
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Protection Engineer Analyzes Run time Data And Protection Model After Fault Event
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Protection Engineer Changes Settings Across A Network
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Protection Engineer Plans Wide-Area Protection Schemes Based on System Model
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Protection Engineer Sets up Bus Protection Based on Topology of Substation
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Protection Engineer Verifies Protection Models from IEC 61850 Configuration
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Real Time Topology Processor
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Remote Supervisory Control - KCPL
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Study Mode Topology Processor
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Synchro Phasor
EPRI Use Case Repository
2010
01/27/2010 - 17:16
System Engineer Adds a Transmission Line with IEC 61850 Protection
EPRI Use Case Repository
2010
01/27/2010 - 17:16
System Engineer Creates CIM Model From IEC 61850 Configuration
EPRI Use Case Repository
2010
01/27/2010 - 17:16
System Engineer Retrofits A Substation
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Telemetry Definition
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Voltage Security
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Volt VAR Optimization
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Wide Area Monitoring and Control Systems - Emergency Operations Baseline
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Wide-Area Control System Advanced Auto-Restoration
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Wide-Area Monitoring and Control - Automated Control Functions
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Customer (residential and commercial) implements Demand Response system and responds to Demand Response signals from the utility (using AMI)
EPRI Use Case Repository
2010
06/01/2010 - 18:02
Customer Provides Photovoltaic Based Generation Source
EPRI Use Case Repository
2010
06/01/2010 - 18:04
Wide-Area Wind Generation Forecasting
EPRI Use Case Repository
2010
06/01/2010 - 18:05
Import Operational Model to Planning
EPRI Use Case Repository
2010
06/01/2010 - 18:06
Utility Implements Integrated Management of Distributed Energy Resources
EPRI Use Case Repository
2010
06/01/2010 - 18:08
Utility and or Customer Provides Electrical Energy Storage in Conjunction with Photovoltaic
EPRI Use Case Repository
2010
06/01/2010 - 18:10
Volt VAr Dispatch, A Sub-function of Operator Switches Feeder
EPRI Use Case Repository
2010
06/01/2010 - 18:12