Abstract: | System is monitored by Volt VAr application to determine if it is operating efficiently. When the system goes out of bounds set by the operator, the application automatically operates field equipment to bring the system back into an optimized state. This application applies to the substation and feeders as a whole, since the two are dependent on each other.
|