Low Side Rollover Specifications
Abstract:

Convert the contingency low side load rollover used in the Energy Management System (EMS) application(s) to the contingency load rollover used in the planning application(s). This would allow coordination between the contingencies used by operations and transmission planning as well as generation planning.

Year Published:
2010
Source:
EPRI Use Case Repository
Use Case Library:
Click here