Project Summary:

The City of Glendale’s Advanced Metering Infrastructure (AMI) Smart Grid Initiative project involves system-wide deployment of advanced meters, use of customer systems and in-home displays, installation of distribution automation equipment systems, and management of distributed energy storage. The project aims to reduce peak loads, overall electricity use, and operations and maintenance costs while increasing distribution system efficiency and reliability. The project implements secure wireless communications to (1) allow customers to view their electricity consumption through Web portals and displays at any time, and (2) allow Glendale to manage, measure, and verify targeted demand reduction during peak periods. In addition to the AMI deployment, Glendale is upgrading selected feeders with distribution automation equipment to improve the operational efficiency as well as system reliability.

Equipment:

- 86,526 Smart Meters
- AMI Communication Systems
--- Meter Communications Network
--- Backhaul Communications
- Meter Data Management System
- Up to 80,000 Home Area Networks
- Customer Web Portal Access for 80,000 Customers
- Up to 30,000 In-Home Displays
- 1.5 MW of Distributed Energy Storage Devices
- Distribution Automation Equipment for 4 out of 11 Circuits
--- Distribution Management Systems
--- Distribution Automation Communications Network
--- Automated Distribution Circuit Switches
--- Automated Capacitors
--- Equipment Health Sensors
--- Circuit Monitors/Indicators

Targeted Benefits:

- Reduced Meter Reading Costs
- Reduced Operating and Maintenance Costs
- Deferred Investment in Distribution Capacity Expansion
- Improved Electric Service Reliability and Power Quality
- Reduced Costs from Equipment Failures and Distribution Line Losses
- Reduced Truck Fleet Fuel Usage
- Reduced Greenhouse Gas and Criteria Pollutant Emissions

 
Additional Information:

For more information about the project, please refer to:
- http://www.smartgrid.gov/project/city_glendale_ami_smart_grid_initiative

Click the PDF icon to download the project description:
Build Metrics:
Archive: