Owner of the document requires that the content be not remodified or redistributed.
Share |



Cheyenne Light, Fuel and Power Company Smart Grid Project
Javascript is required to view this map.
Lead Organization:
Cheyenne Light, Fuel and Power Company
HQ Location:
Cheyenne, Wyoming
Project Contact Information:
Name:
 Mark Stege
Email:
 Mark.Stege@blackhillscorp.com
Address:

108 West 18th Street
Cheyenne, WY 82001-4521

 
Project Summary:

Cheyenne Light, Fuel and Power Company (CLFP) is one of three Black Hills Corporation subsidiaries deploying advanced metering infrastructure (AMI)—the other two are Black Hills/Colorado Electric (BHCOE) and Black Hills Power, Inc. (South Dakota/Wyoming). CLFP’s project includes the deployment of smart meters, communications infrastructure, and a meter data management system (MDMS). The project provides improved outage restoration from the integration of an outage management system with the AMI. Two-way communication allows for off-cycle reads, tamper detection, potential remote connect/disconnect of customer loads and potential future implementation of time-based rate programs.

Equipment:

- 39,102 Smart Meters
- AMI Communication Systems
- Meter Data Management System

Targeted Benefits:

- Reduced Meter Reading Costs
- Improved Electric Service Reliability
- Reduced Ancillary Service Cost
- Reduced Truck Fleet Fuel Usage
- Reduced Greenhouse Gas and Criteria Pollutant Emissions

 
Additional Information:

For more information about the project, please refer to:
- http://www.smartgrid.gov/project/cheyenne_light_fuel_and_power_company_a...

Click the PDF icon to download the project description:
Build Metrics:
Archive: